ArDot

Bids have been let for several South Arkansas highway project by the Arkansas Department of Transportation.

Bids by county:

Ashley

Overlay of nine sections along 18.634 miles of U.S. 82 between Hamburg and Montrose, Pine Bluff Sand & Gravel Co. of Pine Bluff, $4,549,264.52.

Highway 189 Southwest surfacing, Pine Bluff Sand and Gravel Co., Pine Bluff, $485,460.25.

Hempstead

Patmos overlay and surfacing, approximately 0.7 miles, all bids rejected.

Towns of Antoine, 0.42 miles, and Blevins, 1.93 miles, street overlays, all bids rejected.

Nevada

Towns of Cale, 0.65 miles and Emmet, 1,5 miles, overlay and surfacing, Smackover Paving Co. of Smackover, $613,844.50.

Ouachita

Mill and inlay 4.59 miles of asphalt surface in four sections on U.S. 79 between 79B and Airport Road, Jet Asphalt & Rock Co. of El Dorado, $2,672,351.77.

Union

Surfacing of Arkansas 7B in Smackover, Jet Asphalt & Rock Co. of El Dorado, $2,482,062.04.

Click an emoticon to express your reaction to this article.

1
0
2
0
1

Recommended for you